DreamLine DL-6715-01CL Guide d'installation Page 2

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 1
“FLEX” Enclosure Rev.1, Ver.3 03/2014
2
Preparation
1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed
parts are included in the package by marking all the components on the “Detailed Diagram of
Shower Door Components”. Examine boxes and packages for shipping damage. If the unit has
been damaged, has a finishing defect, or is missing parts, please contact our customer support
department within 5 business days of the delivery date. Please note that DreamLine
TM
will not
replace any damaged products or missing parts free of charge after 5 business days or if the
product has been installed. Feel free to contact DreamLine
TM
if you have any questions.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine is
not responsible for code compliance standards for your project and will not accept any
returns.
3. If this unit is going to be installed in a new construction, please, install all of the required plumbing
and drainage before installing the shower. Use a competent and licensed (if required by local
code) plumber for all plumbing installation period.
4. Prior to installation, please ensure that the installation surface is level and solid and will be able to
support the total weight of the unit. Also, make sure that the walls are plumb. Depending on the
type of unit you are installing, some adjustments in leveling may be possible. However, irregular
installation, surface level or out of square conditions can result in serious problems for your
installation. Please note that some adjustments and drilling may be necessary. Please protect all
primary surfaces of the product during installation. Never set your glass down directly onto a
tile floor. Always use a piece of wood or cardboard to protect the bottom edge and corners of
the glass.
Tools Required
Caulk
Tape
Measure Pencil
Screwdriver
Phillips
Level
Gun
Caulk
Drill
Electric
Hammer
Drill bit
Drill bit
(Ø=5/16")
(Ø=1/8")
Vue de la page 1
1 2 3 4 5 6 7 ... 15 16

Commentaires sur ces manuels

Pas de commentaire