DreamLine DL-6150-01 Guide d'installation Page 3

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 42
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 2
“CORNERVIEW” Enclosure Rev.1 Ver.3 05/2013
2
Preparation
1. After opening all boxes and packages, read this introduction carefully. Check that all of the
needed parts are included in the package by marking all the components on the “Detailed
Diagram of Shower Door Components”. Examine boxes and packages for shipping damage. If
the unit has been damaged, has a finishing defect, or has missing parts, please contact our
customer support department within 5 business days of the delivery date. Please note that
DreamLine
TM
will not replace any damaged products or missing parts free of charge after
5 business days or if the product has been installed. Feel free to contact DreamLine
TM
if you
have any questions.
2. Please note that you should consult your local building codes with questions on
installation compliance standards. Building and plumbing codes may vary by location,
and DreamLine is not responsible for code compliance standards for your project and will
not accept any returns.
3. Please ensure that prior to the installation the installation surface is leveled and solid and will
be able to support the total weight of the unit. Also make sure the walls are at right angles.
Irregular installation surface level or improper angle of side walls will result in serious problems
for your installation. Please, note that some adjustments and drilling might be necessary during
the installation process.
4. This unit has to be installed against a finished floor and walls.
5. Please, NOTE! This door has 1/2” out-of-plumb adjustment on each side. Make sure your
walls are at right angles.
Tools Required
Vue de la page 2
1 2 3 4 5 6 7 8 ... 41 42

Commentaires sur ces manuels

Pas de commentaire